MESH BELT FURNACES
TMax 1150 °C (2100 °F)
​
PROCESS CAPABILITIES
​
-
Debinding
-
Sintering of Ferrous & Non-Ferrous parts, certain ceramic / glass parts
-
Sinter Hardening
-
Steam Treatment
Furnace available in a variety of standard sizes ( also custom designed) from 25 Kg/Hr upto 800 Kg/Hr with all electric, gas + electric or all gas heating.
EQUIPMENT FEATURES
​
Debinding
-
Debinding under sintering atmosphere
-
Rapid debinding (RBO)
Chimney Incinerator Muffle
-
Ceramic
-
Cast alloy
-
Wrought alloy
Heating Control
-
Generous zoning
-
Thyristorised
-
Dual level
Atmosphere
-
Endo gas
-
N2 + H2 combination
-
Hydrocarbon doping
-
Methanol doping
-
Multipoint injection & sampling
-
Atmosphere zoning
-
Flow direction control
-
Gas analysis
Separate Debinding and Sintering of Valve Guides
Sintering of Valve Guides
Sinter- Braze Hardening of PM CAM with steel tube
Separate Debinding and Sintering of Valve Guides
VRRC Sinter Hardening Module
​
The separate process step of conventional heat treament of PM parts can be eliminated in several cases by the process of SINTER HARDENING which is done in a module fitted immediately after the sintering furnace, before the water jacket cooling sections. Furnace atmosphere is recirculated across a heat exchanger and impinged on parts as they emerge from the sintering furnace.
​
Accelerated Cooling
​
The length of the water jacketed cooling section can be reduced by the use of an accelerated cooling section placed at the rear of the furnace where the cooling rate is slow.
​
Automated Material Handling
FRICTION MATERIALS